Contents
iii
Contents
ix
1. Site Planning for ftServer 2510, 4410, and 6210 Systems
1-1
1-1
Site Planning for Fault-Tolerant Systems
1-3
1-4
1-7
1-11
2-1
2-1
AC Power and HVAC Service Requirements
2-2
2-4
Connecting a System Directly to Separate AC Sources
2-6
Selecting a UPS Unit for ftServer Systems
2-9
Communicating with a UPS over a Network
2-11
Connecting Power to Systems, PDUs, and a UPS
2-11
Connecting a System Directly to a UPS
2-13
2-15
Power Cords for ftServer Systems and Peripheral
2-15
2-16
2-17
3-1
3-1
3-3
4. Communications Line Planning
4-1
4-2
Содержание ftServer 2510
Страница 1: ...Stratus Technologies R627 04A Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide...
Страница 8: ...Tables viii Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 12: ...Preface xii Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 46: ...Grounding Requirements 2 18 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 50: ...Planning for Cables 3 4 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 62: ...Modem Requirements for Brazil 4 12 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 68: ...Sample PDU Usage Calculation 5 6 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 96: ...Electrical Power Connectors B 10 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 104: ...Index Index 4 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...