Site Planning Checklist
1-4
Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide
(R627)
If VTMs are not present, system software manages the modems and ASN
connectivity is only possible if the operating system is operational.
Site Planning Checklist
Referring to the information in this document, answer the following questions:
Planning for ASN Connectivity
❏
Will your system connect to the ASN? If so, will it connect over an ASN modem or
the Internet?
❏
If your system will use the Internet to connect to the ASN, do you have an Internet
connection available?
❏
If your system will use an ASN modem, do you have an external analog telephone
line available for the ASN modem?
N O T E
A dedicated phone line provides the most reliable service.
ASN calls routed through a PBX may be slow due to load
on the PBX, or may not complete successfully due to
disconnections. If you must use a PBX, do not route the
telephone extension through a switchboard; instead,
provide a direct-dial analog number.
❏
Do you have an additional telephone connection and telephone near the operator’s
station for voice communications when calling for support?
Planning for Network Connectivity
❏
The system contains four embedded 10/100/1000 megabits-per-second (Mbps)
Ethernet ports. You can add optional Ethernet PCI adapters to provide additional
Ethernet bandwidth. Will your system additionally include any of the following PCI
adapters? If so, in
, indicate the total number of ports, and plan network
connections for all Ethernet ports you will use.
N O T E
The four embedded physical adapters provide the basic
requirements for VMware ESX: two adapters are
Table 1-1. Ethernet PCI Adapters
Adapter
Total Number of Ports
U574F-LC Dual-Port Fiber Gigabit Ethernet Adapter
U575F Dual-Port Copper Gigabit Ethernet Adapter
Содержание ftServer 2510
Страница 1: ...Stratus Technologies R627 04A Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide...
Страница 8: ...Tables viii Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 12: ...Preface xii Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 46: ...Grounding Requirements 2 18 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 50: ...Planning for Cables 3 4 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 62: ...Modem Requirements for Brazil 4 12 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 68: ...Sample PDU Usage Calculation 5 6 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 96: ...Electrical Power Connectors B 10 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 104: ...Index Index 4 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...