![Stratus ftServer 2510 Скачать руководство пользователя страница 89](http://html1.mh-extra.com/html/stratus/ftserver-2510/ftserver-2510_site-planning-manual_1383762089.webp)
Circuit Wiring Diagrams
Electrical Circuit and Wiring Information
B-3
hot
input, and the Y input is connected to the N (Neutral) input. However, for split-phase
or three-phase applications, the X and Y inputs are connected to L1, L2, or L3
(separate lines). Therefore, for split-phase or three-phase applications, both X and Y
can be electrically hot with respect to the system base (earth reference ground).
shows the physical locations of the X and Y inputs on the system base.
Figure B-2. Power Input Labeling
shows a single-phase 120V AC circuit connection. Note that this application
requires a single-pole circuit breaker.
Figure B-3. Single-Phase 120V AC Circuit Connection
Power input A or B (Face View)
X
G (PE)
Y
Circuit A or B
X
Y
G (PE)
Wall
Power Cord
L
N
G (PE)
120V
0V
15A Maximum
Содержание ftServer 2510
Страница 1: ...Stratus Technologies R627 04A Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide...
Страница 8: ...Tables viii Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 12: ...Preface xii Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 46: ...Grounding Requirements 2 18 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 50: ...Planning for Cables 3 4 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 62: ...Modem Requirements for Brazil 4 12 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 68: ...Sample PDU Usage Calculation 5 6 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 96: ...Electrical Power Connectors B 10 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 104: ...Index Index 4 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...