StorageWorks Wide Expansion Storage Pedestal
2–8
Order Number: EK–SMCPC–UG. A01
Figure 2–5 Power Cable Connection
2.4.3 Installing Devices
The SBB can be installed with pedestal power on (hot installation) or off (cold installa-
tion). Figure 2–6 shows the installation of a 3.5-inch SBB. Since a 5.25-inch SBB re-
quires three pedestal slots, you must remove three adjacent filler panels to install the de-
vice. To install an SBB, complete the following procedure:
CAUTION
Ensure the SCSI ID address of the device being installed does
not conflict with any other devices on the bus.
NOTE
If the SBB does not have a SCSI address switch, the SCSI
address is the same as the slot number in the pedestal. Refer
to Section 3.2.1 for those SBBs that have SCSI switches
mounted at the rear of the SBB.
1. Remove the front bezel from the pedestal as described in Section 4.5.1.
2. Remove the filler panel(s) from the desired slot(s) by squeezing the side mounting
tabs.