StorageWorks Wide Expansion Storage Pedestal
2–6
Order Number: EK–SMCPC–UG. A01
7. Route SCSI “P” cable down behind pedestal, then bend cable to right (as viewed
from behind pedestal).
8. Take bezel with removed filler tab and install it at rear of pedestal as described in
Section 4.5.2, routing SCSI “P” cable through notch created by removed filler tab,
then install remaining bezel at front of pedestal.
9. Connect free end of SCSI "P" cable to host system.
Figure 2–4 Routing SCSI Cable through Side Filler Panel
2.4.2 Power Cable Connection (Figure 2–5)
The pedestal is equipped with an ac distribution unit that provides switch-controlled ac
power. The ac distribution unit is equipped with three short power plugs, two at the front
of the unit and one at the rear. One of the front plugs is connected to the pedestal power
supply at the factory. The second front plug is disconnected and available to plug into
and power a redundant power supply. The plug at the rear of the distribution unit is dis-
connected and available to supply power to a second pedestal if desired.
You must install an ac line power cord to a receptacle on the rear of the ac distribution
unit for connection to 125 or 250 volt line power. Table 2–2 lists the power cords avail-