![STIEBEL ELTRON HSBC 300 cool Скачать руководство пользователя страница 50](http://html.mh-extra.com/html/stiebel-eltron/hsbc-300-cool/hsbc-300-cool_operation-and-installation_1376858050.webp)
INSTALLATIoN
Commissioning
50
| HSBC 300 cool | HSBC 300 L cool www.stiebel-eltron.com
11.4 Sensor installation
11.4.1 Temperature sensor for cooling (accessory), if required
Cooling requires the fitting of a temperature sensor, available as
an accessory.
f
f
Remove the front casing (see chapter "Preparations / Trans-
port and handling / Removing / fitting the front casing").
D
00000
80
42
6
f
f
Insert the temperature sensor into the sensor well "Sensor
heat pump cooling, optional".
D
00000
80
28
8
f
f
Lay the sensor leads in the guide groove provided for this
purpose in the insulation segment.
f
f
Connect the temperature sensor to T(KUE) of terminal XD04
of the appliance.
12. Commissioning
Our customer support can assist with commissioning, which is a
chargeable service.
If the appliance is intended for commercial use, observe the rules
of the relevant Health & Safety at Work Act during commissioning.
For further details, check with your local authorising body (in
Germany, for example, this is the TÜV).
12.1 Appliance handover
f
f
Explain the appliance function to users and familiarise them
with how it works.
f
f
Make users aware of potential dangers.
f
f
Hand over these instructions.
13. Appliance shutdown
!
Material losses
Observe the temperature application limits and the min-
imum circulation volume on the heat consumer side (see
chapter "Specification / Data table").
!
Material losses
Drain the system when there is a risk of frost and the heat
pump is completely switched off (see chapter "Mainte-
nance / Draining the DHW cylinder").
f
f
If you take the system out of use, set the heat pump manager
to standby so that the safety functions that protect the appli-
ance (e.g. frost protection) remain active.