INSTALLATIoN
Installation
www.stiebel-eltron.com
HSBC 300 cool | HSBC 300 L cool |
43
EN
GL
ISH
Preparation for installation of HSBC 3-HKM
The following components are prefitted on the HSBC side at the
pump assembly installation site:
D
00000
80
37
5
10
11
12
13
10 Insulation plugs
11 Profiles for 3-way mixer
12 Insulation mat, closed
13 Adaptor with dummy cap screwed on
f
f
Remove the insulation plugs.
f
f
Remove the closed insulation mat and profiles for the 3-way
mixer and the heating circuit pump.
f
f
Counterhold and unscrew the dummy caps from the
adaptors.
HSBC 3-HKM installation
1-2 Nm
D
00000
81
57
6
f
f
Move the 3-way mixer with servomotor to the correct instal-
lation position.
D
00000
80
37
6
7
8
10
(*)
(*) Pipe assembly inserted
7 Insulation mat for 3-way mixer
8 Insulation mat for 3-way mixer and heating circuit pump
10 Profiles for 3-way mixer
f
f
Insert the pipe assembly.
f
f
Insert the flat gaskets into the union nuts for the connection
pipes.
f
f
Counterhold and secure the union nuts to the adaptors.
f
f
Install the profiles on the HSBC side for the 3-way mixer and
the insulation mats on the HKM side for the 3-way mixer and
the heating circuit pump.
f
f
Slide the pipe insulation over the connection pipe connectors
from above.