
Document No.: 985-007011
Revision: A
Effective Date: 08/07/2012
Odyssey
Quad HD System Installation
Verification and Testing
Page 3 of 19
“WARNING: This is a revision controlled document. Verify revision is correct prior to use.”
Stereotaxis, Inc
Confidential
Table Of Contents
List Of Figures
FIGURE 1 – INSULATION FROM BUILDING STEEL OR GROUND TEST SETUP
................................. 10
FIGURE 2 – PROTECTIVE EARTH RESISTANCE TEST SETUP
............................................................ 11
List Of Tables
TABLE 1 - ELECTRICAL POWER WITH A NEUTRAL WIRE PRESENT
.................................................... 6
TABLE 2 - ELECTRICAL POWER WITHOUT A NEUTRAL WIRE PRESENT
............................................ 6
TABLE 3 - CONNECTION CROSS REFERENCE
..................................................................................... 18