Document No.: 985-007011
Revision: A
Effective Date: 08/07/2012
Odyssey
Quad HD System Installation
Verification and Testing
Page 8 of 19
“WARNING: This is a revision controlled document. Verify revision is correct prior to use.”
Stereotaxis, Inc
Confidential
3.2.
Electrical Safety Verification
Equipment Required
HYAMP lll Model 3130
Hioki Model 3454-11
Hand tools as required such as screwdrivers, etc. to enter electrical panels and junction boxes.
3.2.1. Insulation from Building Steel or Ground
Purpose: To ensure that the Odyssey system is insulated from the building construction
and that the insulation resistance is within specification.
Connect the MegaOhm HiTester between the incoming PE Ground wire and the Odyssey
Cabinet during installation. Test for accidental earthing of the system by testing frequently
while connecting the cables to the Odyssey Cabinet.
Do not use the MegaOhm
HiTester with power applied to the system.
Switch the Odyssey Quad HD UPS OFF and then the Odyssey Quad HD system OFF.
Switch the main circuit breaker or disconnect feeding the Odyssey Quad HD system OFF so NO
power is applied to the Odyssey Cabinet.
Disconnect the following cables on the Odyssey Quad HD Cabinet that connect to the Niobe System
(If Applicable) and X-ray System:
W663 from MDM (A1-Input 27) (Niobe VGA cable)
W664 from Router (A9-Port 2) (Niobe system Ethernet cable)
W666 from A11-J47 (Niobe TPI Ethernet cable)
W559 from Router (A9-Console) (DB9 serial cable)
W299 from W794 (DB9 serial cable)
W618 from A11-J46 (X-Ray Live A TPI Ethernet cable)
W619 from A11-J45 (X-Ray Ref A TPI Ethernet cable)
W394 from A39-Out3 (Control Room Monitor DVI for HD Monitor)
W397 from A39-Out4 (Procedure Room Monitor DVI for HD Monitor)
Procedure room Quad monitor video cables (four CAT-6 cables)
Control Room Quad Monitor video Cables (four CAT-6 Cables)
W366 from Procedure room monitor (power cable)
W367 from Procedure room monitor (ground wire)
W622 from Control Room (Power Cable)
W623 from Control Room (Ground Cable)
Disconnect all external systems from the Odyssey Quad Procedure Room Hub.
Disconnect associated TPI-J1 from all external systems.