3.2.3
Electrical Safety Verification Summary
Odyssey Quad P/N
System serial number
Date(s) of tests
Location of tests
Test Equipment required:
Instrument
Manufacturer
Model Number
Serial Number
Calibration Due Date
MegaOhm
HiTester
Ground Bond
Tester
Test Results:
Safety Test
Test Result
Test Limit
Pass / Fail / NA
Insulation
_____ MegaOhm
> .2 MegaOhm
Ground Bond Tester
Verification
N/A
N/A
Cabinet
Earth Resistance
_____ milliohm
< 100milliOhm
Control Room Monitor
Earth Resistance
_____ milliohm
< 100milliOhm
Procedure Room Hub
Earth Resistance
_____ milliohm
< 100milliOhm
Procedure Room Monitor
Earth Resistance
_____ milliohm
< 100milliOhm
Electrical Safety Testing Performed by:
Signature: _________________________________ Date: ___________________________________
Print Name: ________________________________ Company Name: __________________________
Test Summary: Pass: _______________ Fail: _______________