Tech Support:
www.steppir.com/support
Tel: 425.891.6134
Page 6
DB42 TABLE OF CONTENTS (page 4 of 4)
Page(s)
CHAPTER TWELVE—ELEMENT SUPPORT TUBE (EST) PREPARATION
77—82
SECTION 12.0
Prepare the telescoping poles for the 40/30 loop elements
77—78
SECTION 12.1
Attach the couplers to the sweep tubes
79—80
SECTION 12.2
Mount the fiberglass spreaders on the sweep couplers
81
SECTION 12.3
Attach foam plugs to the non-loop telescoping poles
82
CHAPTER THIRTEEN
83—85
SECTION 13.0
Prepare the CPVC inner-guide tube and diverter cone
83
SECTION 13.1
Attach the EST to the EHU
84—85
CHAPTER FOURTEEN—40.30 ELEMENT TRUSS KIT
86—89
SECTION 14.0
Installing the truss support mast
86
SECTION 14.1
Attach the truss couplers
87
SECTION 14.2
Routing the Dacron truss cord
88—89
CHAPTER FIFTEEN—SECURE CABLES & MOUNT DB42 ON TOWER MAST
90—92
SECTION 15.0
Secure the cables onto the boom
90
SECTION 15.1
Mount the DB42 onto the tower mast
91—92
Last steps—read before attaching antenna mast tower mast!
92
CHAPTER SIXTEEN—TROUBLESHOOTING TIPS
93—96
SECTION 16.0
Troubleshooting tips
93—94
Warranty Information
95
SteppIR Contact information
96