Tech Support:
www.steppir.com/support
Tel: 425.891.6134
Page 3
DB42 TABLE OF CONTENTS (page 1 of 4)
Page(s)
PREAMBLE
7—17
OK, NOW WHAT? Advice on what to do after you order your antenna
—by Jim Streible K4DLI
7—8
DB42 Bill of Materials (BOM)
9—14
A word about stainless steel galling
15
Preparing to build the DB42 Yagi
16
Element configuration drawing
17
CHAPTER ONE—BOOM ASSEMBLY
18—21
SECTION 1.0
Boom assembly overview
18
Boom bolt / EZ-Eyebolt drawings
19
SECTION 1.1
Measuring and marking the boom
20
Boom marking table
21
CHAPTER TWO— MOUNTING THE EHU’s ON THE BOOM
22—25
SECTION 2.0
Center-to-center spacing measurements
22
Section 2.1
Element housing unit (EHU) wiring overview
23
Wiring the EHU
24—25
CHAPTER THREE—DIRECTOR 1 EHU
36—38
SECTION 3.0
Director 1 EHU and return tube assembly drawing
26
Attach the element mounting plate to boom
27—28
SECTION 3.1
Element support tube (EST) mounting overview
29
Prepare the mounting plate for attaching the EST’s
30
SECTION 3.2
Attach the EST’s to the mounting plate
31
SECTION 3.3
Secure the Director 1 EHU to the mounting plate
32—33
SECTION 3.4
Install the CPVC inner-guide tubes
34—35
SECTION 3.5
Return tube assembly—Director 1
36 –38