16400-7802 GBY REV G
D - COMBUSTIBLE OR NON-COMBUSTIBLE
BACKER MATERIAL (I.E. SHEETROCK)
E - COMBUSTIBLE
MANTEL
F - COMBUSTIBLE
HEARTH
G. ACCESS PANEL
i. COMBUSTIBLE FRAMING
AND FINISHING MATERIAL
A. No combustible materials may be within 6” [152mm] of the top of the fireplace.
B. 1/2” [12.7] CLEARANCE TO COMBUSTIBLES ON SURFACE. The fireplace ships with standoffs in place to ensure a 1/2” clearance to
combustibles is maintained on the surface. See Figure 10A.1. If the standoffs are removed, only non-combustible material can be installed against
the surface of the fireplace such as a non-combustible backer cement board. 1/2” [12.7mm] minimum thickness must be used in the space* between the
top of the 3’’ trim to the combustible framing the full width of the fireplace. The space* includes a 7” [178mm] minimum above the top of the fireplace that
is recommended for ease of attachment. *= 15" [381] for 3'-7' units and 19" [483] for 8' units.
See Figure 10A.2
C. Combustible material may cover the non-combustible area mentioned in B.
D. Combustible finishing materials allowed.
E. Combustible mantel may be placed above the top of the glass viewing area. There are no restrictions on mantel depth.
F. Combustible hearth may be placed below the bottom of the glass viewing area.
G. Flat covers will cover the components access. Gas and electric inlets are located behind this panel. There are four access panel options all
located on the pilot side of the fireplace; front (shown above), side, back and inside behind the glass.
Please take consideration of which option will be used to access the components for service later during planning.
I. Combustible framing and finishing materials allowed.
C - COMBUSTIBLE OR NON-COMBUSTIBLE
FINISHING MATERIAL
A
STANDOFF
REFER TO (B)
B
3” TOP TRIM
COMBUSTIBLE FRAMING
11 - FINISHING
A.1 FINISHING THE WALL - USING THE PROVIDED 1/2" STANDOFFS
NOTE:
DO NOT
BAYCE ANY OF THE BLACK PAINTED SURFACES WITH SCREWS, RIVETS, ETC.
THIS INCLUDES THE 3" BLACK TOP AND BOTTOM GLASS TRIM AND ANY PAINTED SIDES ADJACENT TO THE GLASS.
NOTE: REFER TO DIMENSIONS SECTION FOR ALLOWABLE FINISHING DIMENSIONS REQUIRED TO FIT THE GLASS
PANELS INTO THE FIREPLACE. FINISHING MATERIALS MUST NOT OVERLAP THE DIMENSIONS HIGHLIGHTED IN GREEN ON
PAGE 5. NEVER COVER THE GLASS WITH FINISHING MATERIALS.
NOTE: REFER TO SECTION 5 MANTEL REQUIREMENTS: NON-COMBUSTIBLE ZONE USING PROVIDED 1/2" STANDOFFS FOR
MORE INFORMATION.
Figure 11A.1
Содержание 3BY-24GL
Страница 2: ...INS_CUST UL REV E Page 2...
Страница 35: ...Page 35 16400 7802 GBY REV G...
Страница 51: ...Page 51 16400 7802 GBY REV G...
Страница 52: ...INS_CUST UL REV E Page 52...