![Stellar Hearth Products 3BY-24GL Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/stellar-hearth-products/3by-24gl/3by-24gl_installation-and-operating-manual_1371591012.webp)
INS_CUST UL REV E
Page 12
4 - PREPARE THE FIREPLACE
CAUTION: FIREPLACE IS NOT LOAD-BEARING.
NOTE: OTHER CLEARANCES APPLY. ALL CLEARANCES MUST BE MAINTAINED.
A. STANDOFF INSTALLATION
Figure 4A.1
Figure 3A.2
Figure 4A.3
Placement of the standoffs and nailing flanges
on the BAY fireplace.
LOOSEN SCREW
LOOSEN SCREW
AND FOLD EACH
AND FOLD EACH
STANDOFF
STANDOFF
REMOVE
REMOVE
SECOND SCREW
SECOND SCREW
STEP 1: Refer to Figure 4A.1
The (4) standoffs will be shipped in a flat state placed on the firebox top.
Locate the standoffs and loosen the screws holding them in place.
STEP 2: Refer to Figure 4A.2
Fold the center of the standoff up and both ends out at the perforated
lines. Using Figure 4A.2 for reference, locate the second pre-installed
screw on the firebox top at each standoff location. Remove the screw,
pivot the folded standoff into location and re-install the screw to secure
the standoff. Tighten up the screw that was loosened in Step 1.
Figure 4A.2
PIVOT FOLDED STANDOFF
PIVOT FOLDED STANDOFF
AND SECURE
AND SECURE
LOOSENED SCREW
LOOSENED SCREW
The BAY fireplace has a quan
-
tity of four (4) standoffs that
are secured with
two (2) screws each (left and
right sides of top).
The BAY fireplace has a quantity of four (4)
tabs that are secured with two (2) screws
each (left and right sides of fireplace.
STANDOFFS
NAILING TABS
STANDOFFS
STANDOFFS
Содержание 3BY-24GL
Страница 2: ...INS_CUST UL REV E Page 2...
Страница 35: ...Page 35 16400 7802 GBY REV G...
Страница 51: ...Page 51 16400 7802 GBY REV G...
Страница 52: ...INS_CUST UL REV E Page 52...