![Stellar Effects Modeling Solutions REFIT SIGNATURE Series Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/stellar-effects-modeling-solutions/refit-signature-series/refit-signature-series_manual_1371573009.webp)
9
NECK HOLE FOR SAUCER WIRE CONNECTION TO BOARD
A hole must be made where the neck connects to the lower saucer to allow for
the JST Connectors and wire from the harness to come up from the secondary hull into
the saucer. Refer to the picture below for details.
Hole depicted in neck connection area should be cleared to accommodate the saucer connectors. Only one at a time needs to pass
through. Also note that a center hole in the planetary sensor area may be drilled to accommodate a 5mm LED for ambient light
PHASER HOLES FOR LASERS
Holes for the optional phaser lasers may be drilled into any phaser bank you
choose to mount lasers. You can mount lasers for a single bank or for all of them if you
choose. You must drill 3/32” holes angled the same direction you want to aim the lasers,
if using them, from the banks you mount the phasers. You should file or sand down the
turret nibs for each phaser bank you’ll be installing before drilling the holes. A pin vise
may give you more accurate angles as well.
Please note that the use of lasers, especially lasers not purchased with the Stellar
Effects Refit Signature Series Lighting and Effects Kit, may be dangerous. Avoid shining
lasers directly into the eyes of any person or animal as some lasers may damage the eye.
(*red lasers sold with the SFX Refit Signature Series are generally considered safe, but
we still recommend avoiding direct contact with the laser beam to any eyes!) Stellar
Effects is not responsible for any damages caused by the use of lasers, whether included
with the kit or purchased from a third party vendor.
Содержание REFIT SIGNATURE Series
Страница 25: ...25...
Страница 27: ...27...
Страница 31: ...31...
Страница 33: ...33 LED STRIP LIGHTING PLACEMENT...
Страница 35: ...35...