Stellar Effects Modeling Solutions REFIT SIGNATURE Series Скачать руководство пользователя страница 20

20 

 

MAIN EHULL/M2

 – This terminal is where the negative wire (GRAY) main interior lights for 

the secondary E-Hull will connect. It is interchangeable with and will function the same as the 
MAIN SAU terminal, but it is best to separate the two sections due to the amperage 
requirements for the LED strips. 

RCS THR/RCS

 – This terminal controls the yellow RCS thruster lights at various points 

throughout the ship. You will connect the negative wire (YELLOW) from the RCS thruster LED’s 
and/or the harness tether wires from the Nacelles and Saucer B tether here. 

PYL/PY

 – This terminal controls the pylon spotlights in the secondary E-Hull. Connect here with 

an ORANGE wire connected to the negative leg of the components. 

FWD NAC/FN

 – This terminal is for the Forward Nacelle Spotlights on the front side of each 

warp nacelle. Connect the negative leg of the LED’s to this terminal (or the harness terminal) 
with a GREEN wire. 

NECK/NK

 – This terminal is for the Neck Spotlights in the E-hull. Connect the negative leg of 

the LED’s to this terminal with a BROWN wire. 

NAC REG/RN

 – This terminal is for the Nacelle Registry Spotlights in the aft section of the 

nacelles. (For tips on how to illuminate the registries, see the section on Raytheon lighting) 
Connect the negative leg of the LED’s to the terminal (or harness) using a PURPLE wire. 

PLA SEN/PL

 – This terminal controls the spotlights in the Planetary Sensor Array at the 

bottom of the saucer. Connect the negative leg of the LED’s to the terminal (or harness 
terminal) using a YELLOW wire. 

BR SPOT/BR

 – This terminal is for the forward registry spotlight from the Bridge that 

illuminates the ship’s main registry markings on the top of the saucer. Connect the negative leg 
of the LED’s to the terminal (or harness terminal) using an ORANGE wire. 

EHULL SPOT/EH

 – This terminal is for the side E-hull registry spotlights. Connect the 

negative leg of the LED’s to the terminal using a YELLOW wire. (For tips on how to illuminate the 
registries, see the section on Raytheon lighting) If using the Shuttle Bay Board, the rear 
Raytheon light attached to the board there can alse be connected to this terminal with a 
YELLOW wire. If you are not using the SFX Shuttle Bay Board, you can connect a standard LED 
here with a YELLOW wire to the negative leg to illuminate the aft registry beneath the bay 
doors. 

WEAPONS LIGHTING SIDE: 

PHA1/PH1 and PHA2/PH2

- These terminals control the phasers. The negative side of the 

components you use (Lasers or LED’s) will connect here (or to the harness terminals) with 
PURPLE wires. If you are using lasers, no resistors will be needed. You may connect as many 
phaser ports as you wish to these terminals. Phasers will alternately fire from PHA1 to PHA2. It 
really doesn’t matter which side fires first, but you are free to decide on your own if it is 
important. 

Содержание REFIT SIGNATURE Series

Страница 1: ...1 Stellar Effects Modeling Solutions Presents The REFIT SIGNATURE SERIES Lighting Effects System model by Neil Smith used with permission...

Страница 2: ...Series Harness 24 Upper Saucer Lighting Checklist and Diagram 26 Lower Saucer Lighting Checklist and Diagram 28 Saucer Harness Terminal Layout 30 Secondary Hull Neck Lighting Checklist and Diagram 31...

Страница 3: ...sible Particularly if you re modifying your build for custom lighting options and effects Basic soldering skills are assumed with this kit but if you need help or are not as experienced feel free to c...

Страница 4: ...s But you must choose the most secure method you prefer for your building style to ensure the best lasting connection We will make suggestions in the guide to help whenever possible necessary There ma...

Страница 5: ...ffects Modeling YouTube Page It s worth your time to do a search and watch them for reference to help you learn how to perform these techniques Before we show the alterations you ll need to perform he...

Страница 6: ...erial removal just caution to protect the visible material It s recommended that you mark the specific areas where you want to remove material with a permanent marker to help you know exactly what mat...

Страница 7: ...een appearance of the bridge deck and slotted windows as well as the sloped area at the base of the bridge where the windows are You can also choose to purchase other third party corrected bridge modu...

Страница 8: ...o remove or damage the other raised detail in this area You can use masking tape to help somewhat Area in center marked with an X should also be carefully removed with a rotary tool sanding or grindin...

Страница 9: ...f them if you choose You must drill 3 32 holes angled the same direction you want to aim the lasers if using them from the banks you mount the phasers You should file or sand down the turret nibs for...

Страница 10: ...while installing the lights will greatly aid in getting the proper spotlight direction LOW TEMP hot glue should be used to secure the LED in place once the light is aimed PYLON WIRE GROOVES Grooves mu...

Страница 11: ...r specific instructions DEFLECTOR HOUSING RCS THRUSTERS The deflector housing incorporates a bi color LED for the main forward deflector This lighting kit is designed for a specialized NEOPIXEL LED de...

Страница 12: ...h sides to prevent light bleed A second option is to remove the tab on the fin part and increase the hole already drilled where the fin would have joined the nacelle Either way is effective MOUNTING P...

Страница 13: ...riate resistors for the included power source Deflector Impulse resistors may be different as those effects connect to a 5V terminal instead of the higher 9V or 12V Notice on your LED that each has a...

Страница 14: ...exposed stripped wire around the other end of the resistor and adding solder the same way Then repeat this step for the negative wire and LED leg NOTE you only need a resistor on one LED leg We recom...

Страница 15: ...is where we will add some solder before attaching the wire called tinning the solder point Again touch the solder coil and soldering tip together to the copper solder points not just the iron tip with...

Страница 16: ...almost all the LED s in say your saucer section can have one positive wire spliced from each LED and strip to the next with only a single positive wire having to go back into the harness 12V terminal...

Страница 17: ...causing a short One more trick is using LED strips as a contact point for other LED s as long as either the positive or negative wires or both connect to the same voltage and or effects terminal In th...

Страница 18: ...o tighten onto it enough to hold it in the terminal To fix this make a hook on the exposed wire bending it back on itself so that it will hold better If you are using the included wire wrapping wire i...

Страница 19: ...such as lasers for the phasers and Neopixels for the deflector and impulse crystal No additional resistor is needed for those components if connecting to 5V GR This is a GROUND Negative output You sh...

Страница 20: ...g a PURPLE wire PLA SEN PL This terminal controls the spotlights in the Planetary Sensor Array at the bottom of the saucer Connect the negative leg of the LED s to the terminal or harness terminal usi...

Страница 21: ...icolor torpedo LED s to both PHO RED and PHO BLU terminals But the torpedoes will not be able to fire blue in TMP mode again if connected this way EFFECTS AND SOUND LIGHTING SIDE RED ALERT RA This ter...

Страница 22: ...X Audio IR Board infrared remote sensor Connect the ORANGE wire from the IR terminal on the Audio IR Board here 12V This is a 12V Positive output terminal Use for any 12V positive WHITE wire component...

Страница 23: ...side of the terminal then tighten the screw down to secure the wire into the terminals Note that wires may easily come out of the terminal blocks even when they are screwed down tight To fix this iss...

Страница 24: ...LED Red Orange 2 Orange IMP White 12V Impulse Crystal Neopixel 1 Black GR Blue DEF Red 5V Officer s Lounge Raytheon 3mm LED White 1 Brown M1 White 12V Officer s Lounge lights 5mm LED White 2 Brown M1...

Страница 25: ...25...

Страница 26: ...Gray M1 White 12V Dark boxes indicate LED s may be grouped together on one string of lights NOTE EXTREMELY IMPORTANT TO CONNECT PHASERS TO CORRECT 5V POSITIVE Failure to do so will damage the lasers a...

Страница 27: ...27...

Страница 28: ...V Positive RED DEF Impulse Crystal BLUE GR Ground BLACK IMP Impulse Engine ORANGE RA Red Alert PURPLE M1 Main 1 Interiors GRAY BR Bridge Flood ORANGE STR Strobe Formation Lights BROWN NAV Navigation L...

Страница 29: ...LLOW NAV Navigation Lights GREEN 12V 12V Positive WHITE Terminal blocks should be placed to the rear of the saucer between the Rec Deck window and B C Deck be sure not to block the Raytheon Simply con...

Страница 30: ...lue DEF Red 5V RCS Thrusters 1 8mm LED Yellow 4 diffused Yellow RCS White 12V Pylon Spots 1 8mm LED White 4 Orange PY White 12V Belly Aft Strobe 1 8mm LED White 2 Brown STR White 12V Rear Belly Nav 1...

Страница 31: ...31...

Страница 32: ...r Strip 12 LED Strip Blue or Violet 1 x12 Blue W White 12V Warp Crystal 3mm LED Blue 1 Blue W White 12V NACELLE TETHER TERMINALS RCS Reaction Control Thrusters YELLOW RN Rear Raytheon Nacelle PURPLE S...

Страница 33: ...33 LED STRIP LIGHTING PLACEMENT...

Страница 34: ...lle where the ship s registry number appears has lights in the movie which were actually achieved using spotlights away from the model These lights are supposed to come from the ship but there is in r...

Страница 35: ...35...

Страница 36: ...s You may cycle through the modes Once you ve selected the movie mode you wish to have the model emulate you must initiate the model by pressing the H button at the top right This will lock in the cho...

Страница 37: ...ck on after the startup sequence has completed except in warp mode All exterior lighting will come on in the exact sequence with the original film scene The thrusters initialize at power until the cap...

Страница 38: ...ore the startup has been initialized this button can be pressed to select the TWOK MODE for the ship Once the startup has completed the button will play various music from whichever movie mode was sel...

Страница 39: ...utomatically comes on in Standby Mode in a copper color Except in TSFS mode where it begins in the blue Active Mode as seen in the film After the startup is complete the deflector can be cycled throug...

Страница 40: ...O DESTRUCT sequence yes it s supposed to be humorous can t actually blow up the model after all Just enjoy the show Once the AUTO DESTRUCT sequence has completed the ship will reset and return back to...

Страница 41: ...can be completed in two subassemblies First the neck and top of the secondary hull Install all lighting in the neck using the diagrams and checklist and test Before gluing the neck together run all s...

Страница 42: ...t have to glue the deflector housing on just yet Also connect the upper secondary hull neck wires at this point but do not glue the pieces in place yet If using the placing the main board in the base...

Страница 43: ...rks great for stabilizing the subassemblies while the adhesive cures TAKE YOUR TIME Once everything is secured you should be ready for the finishing touches of paint and decals and then your masterpie...

Отзывы: