![Stellar Effects Modeling Solutions REFIT SIGNATURE Series Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/stellar-effects-modeling-solutions/refit-signature-series/refit-signature-series_manual_1371573010.webp)
10
SECONDARY HULL AREA
PYLON SPOTLIGHTS
The Enterprise kit does have holes already in place where the pylon spotlights
shine up on the pylons from the side walls. However, the pre-drilled holes angle straight
out, which do not allow the spotlights to shine up to the pylons at the proper angle. The
simplest way to fix this is to fill the holes with putty and carefully redrill them at an
angle in the desired direction with a pin vise and a 1/16” or 3/32” drill bit. The spotlight
holes are designated in the picture below. Dry fitting the pylons in place while installing
the lights will greatly aid in getting the proper spotlight direction. LOW TEMP hot glue
should be used to secure the LED in place once the light is aimed.
PYLON WIRE GROOVES
Grooves must be made where the two pylon pieces come together and join to the
secondary hull to accommodate the ribbon cables to the nacelles. The best way to make
these grooves is a flat sided jeweler’s file. Use the included pylon harness to mark off
the size to file, then carefully file the areas shown below on each pylon piece (both
sides) to make room for the wires. BE CAREFUL to avoid removing too much material
(cut too deep) or to damage the pylons themselves in visible areas! Removing too much
material may weaken the pylons causing a droop or break later!
Содержание REFIT SIGNATURE Series
Страница 25: ...25...
Страница 27: ...27...
Страница 31: ...31...
Страница 33: ...33 LED STRIP LIGHTING PLACEMENT...
Страница 35: ...35...