Do not allow anyone to store any of the above-mentioned hazardous items, or similar items in rooms where the System-
Manager is installed! 

The pre-set signs and marks must not be changed, removed, or made illegible. 

All operations must be conducted in accordance with your national electricity regulations and local rules! 

For installation in your country, please see your corresponding institutions for information on regulations and safety 
measures. 

Keep children away from any and all electronics!  Fatal accidents can occur! 

1.4  Waiver Of Liability 

The manufacturer (STECA and its assigned representatives) cannot check that this manual is strictly followed, nor the 
conditions and methods for installation, operation, use and maintenance of the System-Manager. 

Improper installation can lead to physical damage to the System-Manager and its safety features, and thus can endanger 
persons. 

Therefore, we the manufacturer do not take any liability and responsibility for losses, damages and costs which are due 
to an improper installation, operation, use and maintenance or any other consequences resulting from such damage. 

Furthermore, we do not take any liability for infringements of patent rights, or rights of third persons, which result from the 
use of this System-Manager.  

The manufacturer reserves the right to make alterations, without prior notice, to the product itself, technical data or the 
installation and instruction manual. 

If other components, which are not prescribed by manufacturer are connected to this System-Manager, the user has to 
accept the consequences. 

CAUTION: Opening the System-Manager (connecting cover excluded) as well as use other than 
prescribed by the manufacturer, will cause the warranty to be voided. 

2  Range of Applications 

The System-Manager is designed for a wide range of applications from private use to professional use: private homes or 
leisure market (like recreational vehicles or weekend/seasonal cottages, etc.) or in locations where trade, business or 
commerce is done (like workshops, stores, offices etc.) or industrial applications or telecom systems. 

The System-Manager can NOT be used outdoors, where it would not be protected against rain or sun.  

Unless external temperature sensor the System-Manager must be installed in the same room as the battery due to the 
following reasons: 

  an integrated temperature sensor registers the ambient temperature of the room, which is almost identical to 

the battery temperature. 

  In order to keep the voltage drop between System-Manager and battery to a minimum, please only use the 

shortest possible battery cables. 

The System-Manager’s PV input  should only be connected to solar modules. However, the battery can also be charged 
in parallel by other sources with appropriate battery charge functions.  

Hint:  The System-Manager is able to adapt to customised applications. We will optimise your product concerning your 

special requirements. With these modifications the System-Manager will withstand strong ambient conditions like 
advanced temperature range, mechanical and climatic ambient conditions or advanced interference resistance.  

System-Manager  TAROM | 716148 

page 4 

V09_45A 

Содержание Solarix 2401

Страница 1: ...on by internal fuse Automatic electronic fuse Short circuit protection of load and module Overvoltage protection at module input Open circuit protection without battery Reverse current protection at n...

Страница 2: ...User and Operation manual Specially designed for hybrid systems and telecommunications Steca Solarix 2401 4401 716 148 Z02 09_45 PHOTOVOLTAIK PHOTOVOLTAIC PHOTOVOLTAIQUE FOTOVOLTAICA EN...

Страница 3: ...3 Sub Menu 8 6 Installation 10 6 1 Precautions 10 6 2 Location Of Installation 10 6 2 1 Installation On Walls 11 6 2 2 Rules for mounting the System Manager 11 6 3 Preparations 11 6 3 1 Assemblies 11...

Страница 4: ...g on the PV system Before you start work Read the chapter Installation chapter 6 page 10 Make sure that all Precautions chapter 6 1 page 10 are taken Only start to install your System Manager when you...

Страница 5: ...by manufacturer are connected to this System Manager the user has to accept the consequences CAUTION Opening the System Manager connecting cover excluded as well as use other than prescribed by the m...

Страница 6: ...stem is set for use with lead accumulators batteries with liquid electrolyte and can be set for accumulators with fixed electrolyte like gel batteries The System Manager can be used for all types of s...

Страница 7: ...e corresponding final voltages If the Boost Charge voltage level is too high in comparison with the module voltage reduced by wire losses the countdown may never be started and your battery is therefo...

Страница 8: ...through the controller I_mod is the charging current produced by the solar modules When the voltage of the battery is getting near the final charge voltage the module current I_mod is substantially hi...

Страница 9: ...s can be changed by this scrolling action By pressing OK the displayed menu window is activated and the value is indicated Pressing OK once again leads to a closure of the window without adjustment Af...

Страница 10: ...V 30 0V 54 0V 60 0V The equalisation charging can be programmed similar to adjusting the boost charging Press OK to enter edit the equalisation charge voltage by pressing the arrow keys and confirm se...

Страница 11: ...PV system s efficiency and performance The solar PV array should be installed in a way that in the most unfavourable case the voltage drop is not so high that the battery can not be charged completel...

Страница 12: ...Make sure that the heat sink is well ventilated when mounting 6 3 Preparations 6 3 1 Assemblies Before installation lay out all cables junction boxes and safety fuses cut into sections isolate on both...

Страница 13: ...s to the System Manager s battery connection terminals the symbol shows a rectangular battery with and indicators and tighten securely with a proper slot screwdriver Pay attention to the right polarit...

Страница 14: ...In addition to the electronic fuse device mentioned above the System Manager has also been protected by regular fuses which have been rated far beyond nominal currents to prevent false blowing of the...

Страница 15: ...round for all system components All plus connections are internally connected anyway in the System Manager 6 7 2 Negative Grounding If Negative Grounding is used only one minus connection from any one...

Страница 16: ...ssible so that unnecessary costs can be avoided Certainly not all errors are listed below You will find the most common errors and symptoms covering the major part of all possible errors Send in the S...

Страница 17: ...ischarged deeply or increase solar array to add energy to the system Connect all loads through the System Manager to avoid strong discharge of the battery No module is connected otherwise module modul...

Страница 18: ...aired nor replaced or if this does not occur within a suitable period in spite of the specification of an extension period in writing by the customer the reduction in value caused by the fault shall b...

Страница 19: ......

Страница 20: ......

Страница 21: ...716148...

Отзывы: