background image

System-Manager  TAROM | 716148 

page 2 

V09_45A 

 
1

 

Safety Instructions And Waiver of Liability .........................................................................................................3

 

1.1

 

Symbol of Safety Instructions ..................................................................................................................................3

 

1.2

 

How To Use This Manual ........................................................................................................................................3

 

1.3

 

General Safety Instructions .....................................................................................................................................3

 

1.4

 

Waiver Of Liability....................................................................................................................................................4

 

2

 

Range of Applications ...........................................................................................................................................4

 

2.1

 

Performance ............................................................................................................................................................5

 

3

 

Functioning ............................................................................................................................................................5

 

3.1

 

Description...............................................................................................................................................................5

 

3.1.1

 

Overcharge Protection .............................................................................................................................................................. 5

 

3.1.2

 

Temperature Compensation Of Final Charge Voltage............................................................................................................... 6

 

3.1.3

 

Boost Charging (Lead&Sealed) And Equalisation Charging (Only Lead) .................................................................................. 6

 

3.1.4

Automatic Monthly Mixture Of Electrolyte.................................................................................................................................. 6

 

 

3.1.5

Display ...................................................................................................................................................................................... 6

 

 

3.1.6

Overdischarge Protection.......................................................................................................................................................... 6

 

 

3.1.7

Control Keyboard ...................................................................................................................................................................... 7

 

 

3.1.8

 

System Voltage ......................................................................................................................................................................... 7

 

4

 

Indication Of Status ...............................................................................................................................................7

 

5

 

Operating The System-Manager...........................................................................................................................8

 

5.1

 

Safety Cover ............................................................................................................................................................8

 

5.2

 

Main Menu ...............................................................................................................................................................8

 

5.3

 

Sub Menu ................................................................................................................................................................8

 

6

 

Installation ............................................................................................................................................................10

 

6.1

 

Precautions............................................................................................................................................................10

 

6.2

 

Location Of Installation ..........................................................................................................................................10

 

6.2.1

Installation On Walls ............................................................................................................................................................... 11

 

 

6 2.2

 

Rules for mounting the System-Manager ................................................................................................................................ 11

 

.

6.3

 

Preparations ..........................................................................................................................................................11

 

6.3.1

Assemblies.............................................................................................................................................................................. 11

 

 

6.3.2

Preparation Of Wiring.............................................................................................................................................................. 11

 

 

6 3.3

 

Cabling.................................................................................................................................................................................... 11

 

.

6.4

 

Installation And Operation .....................................................................................................................................12

 

6.4.1

Connecting The Battery Bank To The System-Manager ......................................................................................................... 12

 

 

6.4.2

Connecting The Solar PV Module Array To The System-Manager ......................................................................................... 12

 

 

6 4.3

 

Connecting The Loads ............................................................................................................................................................ 12

 

.

6.5

 

Uninstalling ............................................................................................................................................................13

 

6.6

 

Safety Measures ....................................................................................................................................................13

 

6.6.1

Electronic Short Circuit Safety................................................................................................................................................. 13

 

 

6.6.2

Hardware Safety ..................................................................................................................................................................... 13

 

 

6.6.3

Flammability............................................................................................................................................................................ 13

 

 

6.6.4

Overvoltage Protection............................................................................................................................................................ 13

 

 

6 6.5

 

Simple And Double Errors....................................................................................................................................................... 13

 

.

6.7

 

Grounding ..............................................................................................................................................................14

 

6.7.1

 

Positive Grounding.................................................................................................................................................................. 14

 

6.7.2

 

Negative Grounding ................................................................................................................................................................ 14

 

7

 

Maintenance .........................................................................................................................................................14

 

8

 

Technical Data .....................................................................................................................................................14

 

8.1

 

Performance Data..................................................................................................................................................14

 

8.2

 

Controlling Data at 25°C ........................................................................................................................................15

 

9

 

Malfunctions And Errors .....................................................................................................................................15

 

10

 

Legal Guarantee...................................................................................................................................................16

 

 

 

 

 

 

 

 

 

 

© Steca GmbH; Version 09_45; S.Nr. 716.148 

Содержание Solarix 2401

Страница 1: ...on by internal fuse Automatic electronic fuse Short circuit protection of load and module Overvoltage protection at module input Open circuit protection without battery Reverse current protection at n...

Страница 2: ...User and Operation manual Specially designed for hybrid systems and telecommunications Steca Solarix 2401 4401 716 148 Z02 09_45 PHOTOVOLTAIK PHOTOVOLTAIC PHOTOVOLTAIQUE FOTOVOLTAICA EN...

Страница 3: ...3 Sub Menu 8 6 Installation 10 6 1 Precautions 10 6 2 Location Of Installation 10 6 2 1 Installation On Walls 11 6 2 2 Rules for mounting the System Manager 11 6 3 Preparations 11 6 3 1 Assemblies 11...

Страница 4: ...g on the PV system Before you start work Read the chapter Installation chapter 6 page 10 Make sure that all Precautions chapter 6 1 page 10 are taken Only start to install your System Manager when you...

Страница 5: ...by manufacturer are connected to this System Manager the user has to accept the consequences CAUTION Opening the System Manager connecting cover excluded as well as use other than prescribed by the m...

Страница 6: ...stem is set for use with lead accumulators batteries with liquid electrolyte and can be set for accumulators with fixed electrolyte like gel batteries The System Manager can be used for all types of s...

Страница 7: ...e corresponding final voltages If the Boost Charge voltage level is too high in comparison with the module voltage reduced by wire losses the countdown may never be started and your battery is therefo...

Страница 8: ...through the controller I_mod is the charging current produced by the solar modules When the voltage of the battery is getting near the final charge voltage the module current I_mod is substantially hi...

Страница 9: ...s can be changed by this scrolling action By pressing OK the displayed menu window is activated and the value is indicated Pressing OK once again leads to a closure of the window without adjustment Af...

Страница 10: ...V 30 0V 54 0V 60 0V The equalisation charging can be programmed similar to adjusting the boost charging Press OK to enter edit the equalisation charge voltage by pressing the arrow keys and confirm se...

Страница 11: ...PV system s efficiency and performance The solar PV array should be installed in a way that in the most unfavourable case the voltage drop is not so high that the battery can not be charged completel...

Страница 12: ...Make sure that the heat sink is well ventilated when mounting 6 3 Preparations 6 3 1 Assemblies Before installation lay out all cables junction boxes and safety fuses cut into sections isolate on both...

Страница 13: ...s to the System Manager s battery connection terminals the symbol shows a rectangular battery with and indicators and tighten securely with a proper slot screwdriver Pay attention to the right polarit...

Страница 14: ...In addition to the electronic fuse device mentioned above the System Manager has also been protected by regular fuses which have been rated far beyond nominal currents to prevent false blowing of the...

Страница 15: ...round for all system components All plus connections are internally connected anyway in the System Manager 6 7 2 Negative Grounding If Negative Grounding is used only one minus connection from any one...

Страница 16: ...ssible so that unnecessary costs can be avoided Certainly not all errors are listed below You will find the most common errors and symptoms covering the major part of all possible errors Send in the S...

Страница 17: ...ischarged deeply or increase solar array to add energy to the system Connect all loads through the System Manager to avoid strong discharge of the battery No module is connected otherwise module modul...

Страница 18: ...aired nor replaced or if this does not occur within a suitable period in spite of the specification of an extension period in writing by the customer the reduction in value caused by the fault shall b...

Страница 19: ......

Страница 20: ......

Страница 21: ...716148...

Отзывы: