background image

This window monitors also battery voltage (13,7) as well as charge current (+04.3) and the discharge 

current (-12.4) with more accurate values. 

5  Operating The System-Manager 

5.1  Safety Cover 

The safety cover is a plastic lid covering the programming keys and safety fuses. The lid can be removed if desired. In 
order to avoid undesired modification of important settings, however, it is recommended that the lid be left on the System-
Manager. Intentionally, the lid is designed to be difficult to open. This is to prevent unwanted changes from being easily 
made. The lid can be easily opened with following trick. 

Hint:  To open the cover, using your left-hand, stick your fingernail into the slot, move it along the slot and pull open the 

cover. 

When putting the lid on the case again, please make sure to put the turning joint into the case first and then into the 
snap-in hole. 

Using one of the option you can break the rated point on the left side. 

5.2  Main Menu 

Pressing the MENU button you will 

enter into 

the menu. With the arrow keys 

▲▼

 you 

can scroll through the menu items, 

but no 

values appear and no parameters 

can be 

changed by this scrolling action. To 

enter into a 

selected window press OK.  

System-Manager  TAROM | 716148 

page 8 

V09_45A 

 

  With the arrow keys 

▲▼

 you 

can 

scroll through the menu items, 

but no 

values appear and no 
parameters can be changed by 

this 

scrolling action. 

 By pressing OK the displayed 

menu 

window is activated, and the 

value is 

indicated. Pressing OK once again leads to a closure of the window without adjustment. 

  After a menu window is activated and its value is displayed, use the arrow keys 

▲▼

 to can change the value. When 

the maximum value has been reached, the parameter starts at the lowest value again. By constantly pressing the key, 
the value starts to scroll in small steps. 

  Confirmation and storage of the new value is done by pressing OK 

  if no selection of another menu is made within 5 seconds after OK is pressed, the System-Manager will automatically 

exit from all menus and the normal indication of running status appears . 

  If there are no adjustments for 2 minutes on an activated submenu value being changed, the display indication jumps 

to the main menu and the adjustment in the open window is not stored or applicable. 

 The MENU key will bring the display back to the status indicator display. 

5.3  Sub Menu  

Here you have the possibility to directly influence the System-Manager’s behaviour 

Within this window, the load can manually be connected or disconnected. By pressing OK you enter 

this window and you may then switch 

▲▼

 from “load on“ to “load off“ or ”auto“. However, the battery will still be 

protected from the worst discharge by an emergency cut-off that cannot be overridden by the manual control function. 
load off“ switches off all loads and may be used as main switch if you leave your solar system for a longer period of 

Содержание Solarix 2401

Страница 1: ...on by internal fuse Automatic electronic fuse Short circuit protection of load and module Overvoltage protection at module input Open circuit protection without battery Reverse current protection at n...

Страница 2: ...User and Operation manual Specially designed for hybrid systems and telecommunications Steca Solarix 2401 4401 716 148 Z02 09_45 PHOTOVOLTAIK PHOTOVOLTAIC PHOTOVOLTAIQUE FOTOVOLTAICA EN...

Страница 3: ...3 Sub Menu 8 6 Installation 10 6 1 Precautions 10 6 2 Location Of Installation 10 6 2 1 Installation On Walls 11 6 2 2 Rules for mounting the System Manager 11 6 3 Preparations 11 6 3 1 Assemblies 11...

Страница 4: ...g on the PV system Before you start work Read the chapter Installation chapter 6 page 10 Make sure that all Precautions chapter 6 1 page 10 are taken Only start to install your System Manager when you...

Страница 5: ...by manufacturer are connected to this System Manager the user has to accept the consequences CAUTION Opening the System Manager connecting cover excluded as well as use other than prescribed by the m...

Страница 6: ...stem is set for use with lead accumulators batteries with liquid electrolyte and can be set for accumulators with fixed electrolyte like gel batteries The System Manager can be used for all types of s...

Страница 7: ...e corresponding final voltages If the Boost Charge voltage level is too high in comparison with the module voltage reduced by wire losses the countdown may never be started and your battery is therefo...

Страница 8: ...through the controller I_mod is the charging current produced by the solar modules When the voltage of the battery is getting near the final charge voltage the module current I_mod is substantially hi...

Страница 9: ...s can be changed by this scrolling action By pressing OK the displayed menu window is activated and the value is indicated Pressing OK once again leads to a closure of the window without adjustment Af...

Страница 10: ...V 30 0V 54 0V 60 0V The equalisation charging can be programmed similar to adjusting the boost charging Press OK to enter edit the equalisation charge voltage by pressing the arrow keys and confirm se...

Страница 11: ...PV system s efficiency and performance The solar PV array should be installed in a way that in the most unfavourable case the voltage drop is not so high that the battery can not be charged completel...

Страница 12: ...Make sure that the heat sink is well ventilated when mounting 6 3 Preparations 6 3 1 Assemblies Before installation lay out all cables junction boxes and safety fuses cut into sections isolate on both...

Страница 13: ...s to the System Manager s battery connection terminals the symbol shows a rectangular battery with and indicators and tighten securely with a proper slot screwdriver Pay attention to the right polarit...

Страница 14: ...In addition to the electronic fuse device mentioned above the System Manager has also been protected by regular fuses which have been rated far beyond nominal currents to prevent false blowing of the...

Страница 15: ...round for all system components All plus connections are internally connected anyway in the System Manager 6 7 2 Negative Grounding If Negative Grounding is used only one minus connection from any one...

Страница 16: ...ssible so that unnecessary costs can be avoided Certainly not all errors are listed below You will find the most common errors and symptoms covering the major part of all possible errors Send in the S...

Страница 17: ...ischarged deeply or increase solar array to add energy to the system Connect all loads through the System Manager to avoid strong discharge of the battery No module is connected otherwise module modul...

Страница 18: ...aired nor replaced or if this does not occur within a suitable period in spite of the specification of an extension period in writing by the customer the reduction in value caused by the fault shall b...

Страница 19: ......

Страница 20: ......

Страница 21: ...716148...

Отзывы: