Page 51
Photo Appendix
Explosion drawings are included throughout the instructions. Photographs have been included for those who prefer them.
1. Mark post hole positions
2. Install
post
3. Install
deck
4. Install deck clamp
5. Install pipe clamp
6. Install panel (slide guard/arch wall/etc.) to pipe clamp
7. Leveling
Suggestion
8. Leveling
Suggestion
Содержание Bobbie 911-124
Страница 1: ...Page 1 800 727 8180 www sportsplayinc com 911 124 Model Bobbie...
Страница 3: ...Page 3...
Страница 13: ...Page 13 Footing Diagram...
Страница 15: ...Page 15 Side view of installed post...
Страница 25: ...Page 25...
Страница 52: ...Page 52 1 2 4 3...
Страница 53: ...Page 53 5 6 8 7...