Page 23
Kick Plate Plan:
Kick plates are installed to close the gaps created when decks
rise in ‘staircase’ fashion.
INSTRUCTIONS:
•
Kick plates are bolted to the FRONT of the higher deck
and the BACK of the lower deck.
•
Bolt kick plate to both decks.
•
Insure that all hardware is tight.
SPECIFICATIONS:
Event: Kick plates are powdercoated.
Paint shall be electrostatically applied oven cured powdercoat.
Hardware: Stainless steel tamper resistant
MAINTENANCE:
Touch up any marred paint surfaces.
Periodically check hardware for integrity and tightness.
Содержание Bobbie 911-124
Страница 1: ...Page 1 800 727 8180 www sportsplayinc com 911 124 Model Bobbie...
Страница 3: ...Page 3...
Страница 13: ...Page 13 Footing Diagram...
Страница 15: ...Page 15 Side view of installed post...
Страница 25: ...Page 25...
Страница 52: ...Page 52 1 2 4 3...
Страница 53: ...Page 53 5 6 8 7...