Transfer Station Plan:
The transfer station connects to a deck side. Consult the Top
Down View for proper placement of the event.
INSTRUCTIONS:
1. First connect the bottom platform to the two-step
assembly using (4) 3/8” X 1 3/4” button head bolts, (8)
3/8” washers, (4) 3/8” lock nuts.
2. Inside post supports (A+B), Handhold post (C), Short
post (D). Center of A, B, C, D. A+B are 22” from deck
posts, and C+D are 55 1/2” from the deck posts (on
center).
3. Notice the “center line” (broken line): A+B are 14” left
and right from the centerline. C+D are 12 1/2” left and
right from the centerline.
4. Inside posts A+B are located outside the front of the
transfer step bottom.
5. The (2) plank postholes are located by physically
locating them, using the plank as a jig to locate
(depending on whether plank will be on the right or left
of the transfer deck.)
6. Lay out and mark (4) ground holes for posts #A, B, C,
D by physically setting the transfer steps up to the deck,
and use spray paint to mark the (4) holes.
7. Dig them 24” deep and 8” in diameter.
8. Loosely install these posts into their ground holes with
re-bars in the bottom.
9. Connect the top of transfer step to deck (at the four hole
locations on deck side) with (4) 3/8” X 1 3/4” button
bolts, washer on both sides, and lock nuts under deck.
10. The bottom end of transfer step is blocked up vertically
and horizontally on bubble.
11. Determine on which side the step plank will be located
by viewing the Top Down drawing.
12. The handhold post will connect to the front step to the
opposite side of the step plank.
13. Connect the transfer deck bottom front with (1) 3/8” by
3” button head bolt, washer both sides, and lock nut
under the transfer deck.
14. Connect the short post (44” long) to the other side of
front with same bolt connection through hole which is
2” from top of the short post.
15. Connect the left and right handrails to each side
between the left and right deck posts to the vertical
holes located on the corner of second step.
16. (2) pipe clamps, one per post, are installed on the “deck
side” of posts at approx. 23 1/2” over the deck clamps.
17. Line up and bolt the bottom end handrails to outside of
steps with (4) 3/8” by 3” button head bolts, washers and
lock nuts under steps.
18. The bottom nut connection on each side will also
connect to the 2” by 4” plate on the “inside post”.
19. Connect plate to bottom bolts and level and adjust the
inside posts.
20. Locate and match up the (2) holes in the top of angle
plate, (connected to the step plank) to the holes on the
left and right of the transfer step bottom. Hold the
plank assembly there in order to spray paint the
locations for the (2) angle/pipe ground holes (legs for
plank assembly).
21. Dig these two holes 24” deep and 8” wide.
22. Connect the two angle/pipe legs to the plank (so the
legs of angles are on the outside of plank) with (4) 3/8”
Содержание Bobbie 911-124
Страница 1: ...Page 1 800 727 8180 www sportsplayinc com 911 124 Model Bobbie...
Страница 3: ...Page 3...
Страница 13: ...Page 13 Footing Diagram...
Страница 15: ...Page 15 Side view of installed post...
Страница 25: ...Page 25...
Страница 52: ...Page 52 1 2 4 3...
Страница 53: ...Page 53 5 6 8 7...