2. Install the Triple Rail Slide per instructions page 28.
Make sure water drains out of slide bedway and the
slide guard is level, then tighten
3. Install the Bubble Window per instructions page 30.
4. Install the double wall slide per instructions page 26.
Make sure water drains out of slide bedway and the
slide guard is level, then tighten.
5. Install the Mirror Panel per instructions page 36.
6. Install the guard wall per instructions page 40 and the
Steer Wheel per instructions page 42.
7. Install guard wall per instructions page 40.
8. Install the Sand and Water Table per instructions page
44.
9. Install the Pyramid Roofs per instructions page 46.
Step 5: Concrete
1. Once all components and posts are tight and level, you
may concrete. A good rule of thumb is two 80 lb. bags
of concrete per hole. Do not “dry bag” the concrete,
always mix per instructions on concrete bag. Be sure to
leave concrete about 2” from the top of the ground to
allow backfill.
2. Be sure that all splattered concrete is washed off of the
posts and components while it is still wet.
3. Block off installation area for at least 48 hours.
Step 6: Final after 48 hours
1. Return in 2 days to backfill concrete, drill and install
drive (roll) pins per instructions, and install safety
surfacing.
2. Inspect all components to insure the hardware is tight
and all panels are level.
3. Make sure all tools and dropped hardware are removed
from play area.
4. Open the playground.
Содержание Bobbie 911-124
Страница 1: ...Page 1 800 727 8180 www sportsplayinc com 911 124 Model Bobbie...
Страница 3: ...Page 3...
Страница 13: ...Page 13 Footing Diagram...
Страница 15: ...Page 15 Side view of installed post...
Страница 25: ...Page 25...
Страница 52: ...Page 52 1 2 4 3...
Страница 53: ...Page 53 5 6 8 7...