
S P I K E N A N O U S E R G U I D E
24
Brew Day –
Vorlauf
Figure 4
1.
Leave your hoses in the same configuration as the
Mash Control System step.
2.
Install the vorlauf arm into the quick connect fitting
on the top port of the MT. (see
Figure 4
) Be sure to
wet the fitting first to ease installation.
3.
Vorlauf for ~15min or until the wort runs clear
When the mash is completed, it is time to “vorlauf”
or recirculate the mash. This process moves small
particles from the bottom of your grain bed to the
top, preventing them from getting into the boil
kettle and the finished beer.