background image

S P I K E   N A N O   U S E R   G U I D E

16

Assembly – 

Hoses

ITEM

DESCRIPTION

QTY

A

1.5” TC  Barb - .75”

9

B

Long Hose – 6’

2

C

Short Hose – 4’

2

D

Condenser Exit Hose

1

We use oversized barbs so the silicone tubing will be 
securely attached without a need for hose clamps. 
Also, this oversized barb creates a full port which 
doesn’t restrict flow.  Depending on the length you 
cut the hose necessary for the condenser drain, you 
may have 1’ - 3’ additional hose.

A

A

A

A

A

B

C

D

Содержание Nano System

Страница 1: ...Nano System User Guide...

Страница 2: ...19 Heating HLT 20 Strike Water to MT 21 Mash Control System 22 Vorlauf 24 Sparging 25 Using the Steam Condenser 26 Boiling 27 Whirlpool 28 Knockout Transfer 29 Cleaning 30 Congrats on securing your n...

Страница 3: ...1 Ready to get your Nano up and running This guide will show you how to assemble each piece of equipment with step by step instructions and key visuals Hot Liquor Tank Mash Tun Boil Kettle Steam Conde...

Страница 4: ...g down on the element connection Taking these actions will certainly extend the life of your power cords Before installing parts into quick connect QC fittings be sure to lubricate them with water Thi...

Страница 5: ...S P I K E N A N O U S E R G U I D E 4 Assembly Hot Liquor Tank...

Страница 6: ...Liquor Tank 1 B Hot Liquor Tank Bottom Drain Piping 1 C TC Clamp 7 D TC Gasket 7 E TC Butterfly Valve 2 F TC Side Pickup 2 G 6000w Heating Element 2 H Temp Sensor 1 I Power Cord 15 not pictured 2 A B...

Страница 7: ...S P I K E N A N O U S E R G U I D E 6 Assembly Mash Tun...

Страница 8: ...TEM DESCRIPTION QTY A Mash Tun Tank 1 B Manway Door 1 C Grain chute 1 D False Bottom 1 E Mash Tun Bottom Piping 1 F Mash Tun TC Quick Connect Fitting 2 G 3000w Heating Element 1 H TC Clamp 6 I TC Gask...

Страница 9: ...S P I K E N A N O U S E R G U I D E 8 Assembly Boil Kettle...

Страница 10: ...E E C H C D C C F C B B B B G B B B ITEM DESCRIPTION QTY A Boil Kettle Tank 1 B TC Clamp 9 C TC Gasket 9 D Boil Kettle Bottom Piping 1 E Butterfly Valve 3 F 1 Boil Kettle Racking Arm 1 G TC Side Picku...

Страница 11: ...til it becomes too hot to touch Starting with ice in the drain bucket can increase the amount of time the recirculation water can be used for until it gets too hot NOTE Make sure you keep the drain ho...

Страница 12: ...C Gasket 4 D TC Cap 1 E Condenser Piping 1 F 90 Barb 1 G Condenser Mister 1 H 4 TC Clamp 1 I 4 TC Gasket 1 J 4 TC Clear Cap 1 K 1 5 TC Barb 3 4 1 Assembly Steam Condenser Lid A B G F C I C C C H B K E...

Страница 13: ...tly as possible It also has its own dedicated temp sensor You ll be able to see the chiller exit temp on the control panel and adjust the flow rate to achieve your perfect yeast pitch temp NOTE Be sur...

Страница 14: ...S P I K E N A N O U S E R G U I D E 13 ITEM DESCRIPTION QTY A Nano Plate Chiller 1 B Temp Sensor 1 C 1 TC Tee 1 D TC Clamp 2 E TC Gasket 2 F Mounting Nuts 2 Assembly Wort Chiller F F A B C E D D E...

Страница 15: ...E R G U I D E 14 Assembly Pumps NOTE Assemble the outlet valve and air bleed manifold completely before attaching to the pump head Since the cross members of the cart are tight to the pump this will e...

Страница 16: ...G U I D E 15 Assembly Pumps ITEM DESCRIPTION QTY A Pump 2 B TC Clamp 8 C TC Gasket 8 D TC Butterfly Valve 2 E 1 5 TC x 5 8 Barb 90 2 F 1 TC Tee 2 G 1 5 TC 3pc Valve 2 H Mounting Nuts Not Pictured 8 A...

Страница 17: ...2 D Condenser Exit Hose 1 We use oversized barbs so the silicone tubing will be securely attached without a need for hose clamps Also this oversized barb creates a full port which doesn t restrict flo...

Страница 18: ...J K C D C D D C B I E H G A A F A A To install the casters 1 Lock the brake on the caster and then tighten the caster into the cart leg By locking the brake it makes the caster its own wrench and it...

Страница 19: ...lly assembled it s time to get brewing Follow the steps in this user guide for a simple and easy Brew Day experience Auotune the Control Panel Heating HLT Strike Water to MT Mash Control System Vorlau...

Страница 20: ...and press to set the output Press again to see the temperature readout screen 3 To begin your boil we recommend setting the temperature to 100 output to get the boil started When the BK is nearing bo...

Страница 21: ...d input hose Red of air To purge the pump with the HLT drain valve open open the air bleed valve on the pump until a solid liquid stream flows Close the valve your pump is now purged of air Figure 1 5...

Страница 22: ...n If your strike water is too hot you can add cold water If your strike water is too cold use the Mash Control System discussed in Recirculating the Mash step on page 25 heater to heat to desired stri...

Страница 23: ...s setting the pump and element will turn on once the mash tun drops below 1F of your desired temp 3 Recirculated Mash Mash Element On Wort Pump On After mashing in install the vorlauf arm into the top...

Страница 24: ...fill the HLT and bring the water up to the desired temperature for sparging The excess water can be used for double batching or cleaning PRO TIP Ramp speed is roughly 75 F min Set the mash element to...

Страница 25: ...connect fitting on the top port of the MT see Figure 4 Be sure to wet the fitting first to ease installation 3 Vorlauf for 15min or until the wort runs clear When the mash is completed it is time to v...

Страница 26: ...top port on the BK see Figure 5 The green hose will stay in this position for the Whirlpool later 3 Remove the vorlauf arm and install the sparge arm see Figure 5 4 Open both the water and wort pump o...

Страница 27: ...aching boil to avoid any boil over Once the hot break has subsided you can place the steam condenser lid on 6 Run the condenser lid output hose into a floor drain or collection container 7 Make sure t...

Страница 28: ...wer output and press to set the output Press again to see the temperature readout screen 3 To begin your boil we recommend setting the temperature to 100 output to get the boil started When the BK is...

Страница 29: ...I D E 28 Brew Day Whirlpool Figure 6 1 Move the short hose Black from the bottom port of the MT to the BK see Figure 6 2 Turn wort pump on and whirlpool for 15 minutes Lastly let wort stand for 10 min...

Страница 30: ...grain and rinsed down The water exiting the heat exchanger will be roughly 155F and can be used for CIP PRO TIP The best way to lower Wort Out temps is to slow the flow from the wort pump by using the...

Страница 31: ...r next Brew Day 6 Attach the vorlauf arm to the inside of the MT and turn the wort pump on Let this run for a minute or until the plate and tube have been cleaned 7 Turn the wort pump off 8 Close the...

Страница 32: ...nd racking valve 19 Move the hose Gold from the BK racking port to the BK whirlpool port see Figure 12 20 Turn on the wort pump for about 5 minutes This will clean the whirlpool arm and whirlpool valv...

Страница 33: ...still dirty a quick hand scrub with a brush or more time with the CIP ball might be needed 26 Drain the BK After the BK is drained rinse the MT and BK with hot water Figure 14 27 Step 1 27 should be r...

Отзывы: