Spectur Guide for HD5 Installation
1300 802 960 | www.spectur.com.au
21
Step 2:
Load 20 bags of sand into the frame, this will provide an additional 400 kg of mass to
keep the base stable.
Step 3:
Cover the inside of the base with the two sheet metal covers provided, ensure that
the holes on the corners of the sheet line up with the holes on the frame’s corners.
Place the pole supports on
the frame and pole as
shown below, once again
ensuring that the holes all
line up.