Spectur Guide for HD5 Installation
1300 802 960 | www.spectur.com.au
25
Leaving sites orderly
Step 1:
When removing a system from site, completely fill in the hole and smooth out any
mounds. If doing an install, shovel dug up dirt on top of the concrete and then flatten
the mound.
Step 2:
Keep track of trash, do not allow for concrete bags or other trash to litter the site.
Step 3:
If applicable, lock up and secure any sites that you have entered. Comply with the
client’s conditions for entry to the site.