Spectur Guide for HD5 Installation
1300 802 960 | www.spectur.com.au
12
In-ground
What you Need:
Step 1:
Using a post-hole digger, dig a 700
mm deep hole and insert the
Bottom pole. The bottom pole is the
longer of the two poles.
○
Post-hole digger
○
2 or 3 x 20 kg kwikset concrete
○
At least 7L of water
○
Bottom Pole
○
Top Pole
○
Spirit level
○
Measuring tape
○
Spade
○
Ability to measure 2.2 L
increments.