Spectur Guide for HD5 Installation
1300 802 960 | www.spectur.com.au
20
Other Base Options
Mobile Base installation
What you need:
Step 1:
Place pole in the middle of the base as shown below. Then using the 3 M15x140 bolts
provided, secure the pole with a washer on each side of the frame, followed by a nut.
○
2 x sheet metal covers.
○
4 x Triangular metal sheets
○
2 x Pole supports
○
4 x base supports
○
2 x M15x25 bolts
○
2 x M15x15 nuts
○
20 x 12-14x35 Tek screws
○
Socket set
○
20 x Tec screws
○
Socket set for the above bolts
○
3 x M15x140 bolts
○
10 x M15 washers
○
2 x M15x25 bolts
○
4 x M15x30 bolts
○
4 x Base support plates
○
2 x M15x12 nuts
○
20 x 20kg sandbags
○
Mounting pole drilled for
mobile base.
○
Drill + Philips head
Commented [GP2]:
Put these sections below winch section.
That is, finish one compete install and then talk about other
base options
Commented [GP3]:
How is base assembled before this step
Commented [MD4R3]:
This is the condition the base comes
in, but I will do a full assembly of the base when available
Commented [MD5R3]: