GB
52
10. COMMISSIONING PROTOCOL
Date
Device no.:
(see rating plate)
Installation company:
Address of stove fitter
System tested for leaks
yes
no
Safety equipment checked
(DAS, safety valve, MAG)
yes
no
Visual inspection of the chimney system
yes
no
Function check executed
yes
no
Sample - burn-up carried out:
yes
no
Only with SENSO M H
2
O / PIKO H
2
O
Heating system ventilated
Operating pressure checked
yes
no
yes
no
Enter temperatures between insert and return flow boost:
Return flow temperature in °C
Flow temperature in °C
The stove operator has been instructed regarding operation of the
control system and the instructions for assembly and use have been
provided
Signatures
Installer / Operator
Annual maintenance carried out:
Type of work
Name
Date
Signature
IMPORTANT: Keep in a safe place!
• Store these instructions with valid and clearly dated proof of purchase and have the documents ready for our technicians in the event of service work.