For Machines Mfg. Since 8/11
Model SB1001 8K
™
Lathe
-13-
P R E P A R A T I O N
Preparation Overview Required for Setup
The purpose of the preparation section is to help
you prepare your machine for operation. The list
below outlines this basic process. Specific steps
for each of these points will be covered in detail
later in this section.
The typical preparation process is as follows:
1.
Unpack the lathe and inventory the contents
of the box/crate.
2.
Clean the lathe and its components.
3.
Identify an acceptable location for the lathe
and move it to that location.
4.
Level the lathe and bolt it to a workbench or
stand.
5.
Assemble the loose components and make
any necessary adjustments or inspections to
ensure the lathe is ready for operation.
6.
Check/lubricate the lathe.
7.
Connect the lathe to the power source.
8.
Test run the lathe to make sure it functions
properly.
9.
Perform the spindle break-in procedure to
prepare the lathe for operation.
To complete the preparation process, you will
need the following items:
For Lifting and Moving
• Additional people for lifting the lathe (at
least two)
For Power Connection
• A power source that meets the minimum
circuit requirements for this machine (review
Power Supply Requirements on the next
page for details)
For Cleaning & Assembly
• Cotton rags
• Mineral spirits
• Quality metal protectant oil
• Safety
glasses
• Bench mounting hardware as needed
• Precision level