5-164
DNW-A100/A50/A45
DNW-A100P/A50P/A45P
Adjustment after Replacement
8. Tape Running Adjustment
Refer to Section 7-1-2.
9. CTL Head Height Confirmation
Refer to Section 7-1-4.
10. CTL Head Position Adjustment
Refer to Section 7-1-5.
11. Tape Running Confirmation
Refer to Section 7-1-2.
12. AT Head Position Confirmation
Refer to Section 7-1-9.
13. Drum Phase Adjustment
Refer to Section 6-2-1.
14. Full-erase Current Confirmation
Refer to Section 3-11-4.
5-25. Full-erase Head Replacement