5-108
DNW-A100/A50/A45
DNW-A100P/A50P/A45P
Flat cable
Potion A
Slide shaft
RS table block asemmbly
Slide shaft support
Screw (PWH3
x
8)
Shaft holder
Slide table
Cleaning
RM board
Crank arm (B)
E ring
After cleaning,
apply oil
Crank arm (A)
RS table block assembly
Slide shaft
Grease applying
13. Flat Cable Connection
(1) Clean the inserting portion of the flat cable
using a dry cleaning cloth.
(2) Connect the flat cable disconnected in step 3
to the connector on the RM board, then lock.
m
.
Connect the flat cable with the conductor
plating part (printing side) up.
.
Be careful not to bend the flat cable when it
is connected.
14. Slide Shaft Installation
Pass the slide shaft through the hole of the RS
table block assembly.
15. RS Table Block Assembly Installation
(1) Put the slide shaft in the shaft holder while
inserting portion A of the RS table block
assembly shown in the figure into the slide
table.
(2) Install the slide shaft support with the screw.
16. Applying Grease to Slide Shaft
(1) Slightly apply grease to the slide shaft and
extend it to the whole slide shaft.
n
Be careful that the grease dose not adhere to
other parts.
(2) Confirm that the RS table block assembly
moves smoothly when it is shifted to the S-
and L-cassette positions.
17. Crank Arm Installation
(1) Clean the shaft of the crank arm (A) and
apply one drop of oil to it.
(2) Confirm that the RS table block assembly is
in the middle between S and L cassette
positions.
n
Attach the crank arm in the middle between S
and L cassette positions for the adjustment of
gear phase.
(3) Attach the crank arm (B) in the shaft of the
crank arm (A) with the E ring.
5-15. Brake Solenoid Replacement
RS Table Block Assembly Installation
Applying Grease to Slide Shaft/Crank Arm Installation