5-8
DCR-TRV240/TRV340
1-2.
INITIALIZATION OF 8, A, B, C, D, E, F, 1B, 1C,
1F PAGE DATA
Note1:
When reading or writing the 1B, 1C, 1D page data, select page: 0,
address: 10, and set data: 01, then select B, C or D page. The 1B.
1C or 1D page can be chosen by this data setting.
After reading or writing, reset the data of page: 0, address: 10 to
“00”.
Note2:
The A, B and 1B page are DCR-TRV340 model only.
[Connection of the power supply during the initialization
of the data.]
1)
Connect the regulated power supply and the digital voltmeter
to the battery terminal as shown in Fig. 5-1-6.
2)
Adjust the output voltage of the regulated power supply so that
the digital voltmeter display is 6.1 ± 0.1Vdc.
3)
Turn off the power supply.
4)
Turn on the HOLD switch of the adjusting remote commander.
5)
Turn on the power supply.
6)
Perform the initialization of the data.
Note3:
This is normal though the following message is indicated on the
LCD screen.
“FOR InfoLITHIUM BATTERY ONLY”
[Initialization Procedure]
DCR-TRV240 :
1.
Initialization of D page data
2.
Initialization of 8, C, 1C page data
3.
Initialization of E, F, 1F page data
DCR-TRV340 :
1.
Initialization of A, D page data
2.
Initialization of B, 1B page data
3.
Initialization of 8, C, 1C page data
4.
Initialization of E, F, 1F page data
Digital voltmeter
Regulated power supply
Battery terminal
Fig. 5-1-6.
Содержание DCR-TRV240
Страница 102: ...5 1 DCR TRV240 TRV340 SECTION 5 ADJUSTMENTS ...
Страница 177: ... Take a copy of OPTICAL AXIS FRAME with a clear sheet for use 206 OPTICAL AXIS FRAME DCR TRV240 TRV340 ...
Страница 179: ...DCR TRV240 TRV340 208 Sony EMCS Co 2002A1600 1 2002 1 Published by DI Customer Center 9 929 932 31 ...
Страница 180: ...Revision History Ver 1 0 Date 2002 01 History Official Release Contents S M Rev issued 992993231 pdf Reverse ...