PVI
23TL
&
PVI
28TL
Installation
and
Operation
Manual
PVI
Series
Inverters
DOCR
‐
070365
‐
E
Page
18
of
57
3.4
Installing
the
Mounting
Bracket
Figure
3.5
–
Inverter
Wall
Bracket
Mounting
NOTE:
Always
use
all
(8)
mounting
plate
fasteners.
1.
Mark
the
8
holes
on
the
load
‐
bearing
surface
using
the
available
mounting
bracket
as
a
template
(see
Figure
3.5).
2.
Drill
8
holes
with
a
13/32
‐
inch
drill
bit
and
install
eight
“M8
expansion
tubes”
(available
in
accessory
box).
3.
Secure
the
bracket
to
the
wall
using
eight
M8X25
bolts
(available
in
accessory
box).
See
Figure
3.5.
Figure
3.6
–
Inverter
Main
Housing
Mounting
4.
(Option
1)
Lift
mounting:
Attach
both
lifting
eye
bolts
(available
in
accessory
box)
to
the
inverter
housing
box.
Use
a
sling
rope
or
bar
passed
through
both
eye
bolts
to
mount
the
inverter
to
the
bracket.
(Option
2)
Manual
lift:
Two
people
lift
the
inverter
from
the
bottom
and
manually
mount
the
inverter
to
the
bracket.
5.
Carefully
secure
the
main
housing
of
the
inverter
onto
the
bracket.
1
2
3
9.84in. 9.84in.
20
.5
5i
n.
5.
51
in
.
(14
0mm)
(5
22
mm)
(250mm) (250mm)
Содержание PVI 23TL
Страница 136: ...SMA Solar Technology www SMA Solar com ...