Configuration ............................................................................ 38
Integrating the Inverter into the Network.......................................... 38
Changing Operating Parameters...................................................... 38
Deactivating the Arc-Fault Circuit Interrupter (AFCI)........................ 39
Setting SMA OptiTrac Global Peak ................................................. 39
Adjustable Parameters ....................................................................... 39
Disconnecting the Inverter from Voltage Sources.................. 41
10 Troubleshooting ........................................................................ 43
10.1 Cleaning the Inverter.......................................................................... 43
10.2 Event Messages ................................................................................. 43
10.3 Cleaning the Fans .............................................................................. 54
10.3.1 Cleaning the Fan at the Bottom..................................................... 54
10.3.2 Cleaning the Fan on the Left-Hand Side of the Enclosure ........... 55
10.4 Checking the Function of the Fans .................................................... 57
10.5 Checking the PV System for Ground Faults...................................... 57
10.6 Resetting the Operation Inhibition after Detection of an Arc Fault . 60
11 Recommissioning the Inverter.................................................. 61
12 Decommissioning the Inverter ................................................. 63
13 Procedure for Receiving a Replacement Device .................... 65
14 Technical Data........................................................................... 69
14.1.1 Sunny Tripower 12000TL-US / 15000TL-US / 20000TL-US..... 69
14.1.2 Sunny Tripower 24000TL-US........................................................ 71
14.2 General Data ..................................................................................... 72
14.3 Protective Devices .............................................................................. 73
14.4 Climatic Conditions ............................................................................ 74
14.5 Equipment ........................................................................................... 74
14.6 Torques ............................................................................................... 74
14.7 Data Storage Capacity...................................................................... 74
Table of Contents
SMA Solar Technology AG
Installation Manual
7
STP12-24TL-US-IA-en-16
Содержание PVI 23TL
Страница 136: ...SMA Solar Technology www SMA Solar com ...