10
PUSH PRO -0120843
Pre-Operation Safety Inspection
Note
Carefully read, understand and follow all safety rules,
operating instructions, labels and National Safety
Instructions/Requirements.
1.
Open the tray and inspect for damage, fluid leaks
or missing parts daily.
2.
Check daily the level of the hydraulic fluid with
the platform fully lowered. The fluid level must be
within 6 mm (¼″) of the top of the fill hole. Add
recommended hydraulic fluid if necessary. See
“Specifications” on pages 16 to 18.
3.
Check weekly that the fluid level in the batteries
is correct. See “Battery Maintenance” on page
15.
4. Verify that the batteries are charged daily.
5. Check daily that the AC extension cord has been
disconnected from the outlet on the side of the
chassis.
6. Inspect the brakes daily on the rear castor wheels
for proper operation. Step down on the brake
levers and verify that the machine will not move.
7. Check daily that all guardrails are in place and all
fasteners are properly tightened.
8. Inspect the machine thoroughly each day for
cracked welds and structural damage, loose or
missing hardware, hydraulic leaks, damaged
control cable and loose wire connections.
Pre-Operation Safety Inspection
Содержание S3006P
Страница 2: ......
Страница 7: ...PUSH PRO 0120843 5...