
Chapter 4
Installation and Start up
The system is ready when no further pop-ups appear on the monitor.
1. Insert all necessary integrals in the analyzer according chapter 14.
2. From the
[Main Menu]
select the icon
<System Test>
, and
follow the instructions listed in chapter 9.
4.2.4 Starting the system after a period of three or more days of inactivity
Upon initiation of the working day whereas the analyzer was inactive
for a period of three or more days (consisting also of prolonged
weekends) the following steps should be completed:
1. Before the work session can be started:
a.
Replace the tank of distilled H
2
O with a tank of
Wash/System Liquid; ensuring preparation is in accordance to
chapter 13.2.2.1.
b.
Replace the two starter reagent containers of distilled H
2
O
with two original starter reagent containers.
2. Turn on the PC & Monitor. Wait for the PC to start (this is
completed when the “Desktop” window appears).
3. Double click on the “
Maglumi User
“ icon by using either the
mouse or the touch screen.
4. Enter the user name & password in the
[Login]
dialog, and press
<OK>
. The software will start.(you can select check
“√”
for the
<Initialization With Cuvette(s) Clear>
in the
[Login]
dialog ,
refer to section 8.2.1.)
5. Turn on the analyzer ,then the initialization will execute
automatically . If you have select check
“√”
for the
<Initialization With Cuvette(s) Clear>
in the
[Login],
The
analyzer will begin to clear all working channels in the system
to ensure no collisions occur during normal operation.
6. The system is ready when no further pop-ups appear on the
monitor.Insert all necessary integrals in the analyzer according
chapter 14
Execute “
System Test
” selecting the values listed in the Fig
4.2.4-1
Fig 4.2.4-1: Start up Priming Table (1
st
run)
Section
Type
Values
Cycles
Pipettor
3
Washer
3
Chamber Set A
3
Reaction modules
BGW
0
LC - le
0
LC - ri
0
Operating instructions
Page 4-7