8
AC/DC POWER DISTRIBUTION
ULTRA CAMERA POD ASSEMBLY
When ordered the camera pod comes as an assembly however should a strobe board fail it can be ordered
and replaced separately. The camera pod is supplied with both 5VDC to power the “Acquired target indica-
tors” and directional LED’s and 12VDC to power the strobe.
Strobe Board
Camera Board
Camera
Power
Camera
USB
The strobe is held on the camera pod assembly with 4 screws and lockwashers. By viewing the LED’s on the
strobe board the technician should be able to quickly identify if both the 5VDC and 12VDC are present. There
are no test points available. In the figure below all
Target Indicators
and
Directional Indicators
are lit up.
Each of these LED’s require 5VDC to light these LED’s with the exception of the
Strobe ON
indicator it uses
12VDC. The strobe LED’s are infared and appear to be off during the alignment process however this
Strobe
ON
LED indicator was added to the strobe board to alert the technician or alignment technician that the strobe
LED’s are firing. This LED is located behind the intuitive cover and is not visible to the operator however it
can be seen by looking closely.
Target
Not Acquired
Indicators
Caster
Directional
Indicators
Target
Not Acquired
Indicators
Roll Directional
Indicators
Strobe ON
Indicator
Содержание UHR Ultra
Страница 1: ...Service Manual Ultra UHR Ultra and V3400 WHEEL ALIGNER May 2014 ...
Страница 13: ...11 AC DC POWER DISTRIBUTION ...
Страница 14: ...12 AC DC POWER DISTRIBUTION ...
Страница 16: ...14 Theory of Operation Figure 2 Top Field of View Figure1 Side Field of View ...
Страница 19: ...17 Theory of Operation Configuration using single pole wheel clamp ...
Страница 46: ...44 NOTES ...
Страница 67: ...65 Diagnostics ...
Страница 68: ...66 NOTES ...
Страница 83: ......
Страница 84: ...05 07 2014 2014 Impreso en U S A 309 Exchange Avenue Conway AR 72032 TEEWA546P4 Rev C ...