6
5 INSTALLATION
INSTRUCTIONS
When the lift arrives on site, please read the owner’s manual and check for any freight
damages. Also, check the contents to make sure no parts are missing before starting
installation. Gather all the tools listed and make sure the installation instructions are
fully understood before commencing installation.
5.1 UNPACKING
PROCEDURE
1.
Important!
Place the main structural components on wooden blocks so that
the steel frames can be removed.
2.
Remove plastic wrapping.
3.
Remove crossmember, hydraulic line, and extensions.
4.
Remove steel frames.
5.
Lay towers on floor with the carriage side up.
6.
Check the installation area for obstructions. (Lights, Heating Ducts, Ceiling,
Floor Drains...etc.)
7.
Prepare the bay by selecting the location of the lift relative to the walls. Clear
area of all packaging materials to avoid trip hazards. Draw a chalk line on the
floor to represent the center line of the bay and a second chalk line crossing at 90
°
for locating the lift towers. Refer to
Figure 3
.
Содержание EELR326A
Страница 8: ...7 5 2 BAY LAYOUT Figure 3 Bay Layout ...
Страница 10: ...9 Figure 4 Safety Shut Off Bar Installation Figure 5 Safety Shut Off Bar Power Side ...
Страница 24: ...23 8 PARTS MANUAL 8 1 LIFT ASSEMBLY ...
Страница 27: ...26 8 3 HYDRAULIC SYSTEM ...
Страница 29: ...28 8 5 POWER PACK 6 2055 AB 1381 208 230V 1PH 60Hz ...