
19
5.
Reconfirm that the column is level front to rear and side to side
(Figure 14)
. Add
or remove shims as required.
6.
Torque all anchor bolts to 150 ft-lbs. (203 Nm), continually checking that the
column is level as you proceed. If anchor bolts do not tighten to 150 ft-lbs. OR
project more than 1 ¾” above the concrete surface
(Figure 16C)
, the concrete
MUST be replaced by an appropriate concrete pad. (Consult Product
Manufacturer / Supplier for further details).
5.13 SHIMMING OF THE REMAINING TOWER
1.
Using a 4ft. level on the crossmember
(Figure 14)
and a 2ft. level on the low side
column
(Figure 14)
, shim underneath the baseplate until the crossmember and
column are level. Ensure that the baseplate is completely supported by shims
where it does not contact the floor
(Figure 15)
.
WARNING! Do not use more than ½” (13mm) of shims. Anchor bolts supplied
allow for a maximum of ½” (13mm) of shim. If more than ½” (13mm) of
shims are required, DO NOT proceed with installation. Contact Product
Manufacturer / Supplier for further details.
2.
Refer to Bay Layout
(Figure 3)
to ensure that the column is still in the proper
position. Using a rotary hammer drill with a 3/4” masonry drill bit, drill holes in
the floor on the low side column using the column baseplate as a template. Make
sure that the 3/4” masonry drill is in good condition
(Figure 16A)
.
3.
Carefully clean out drilling dust from the anchor holes. Hammer in the anchor
bolts
(Figure 16B)
. Hand tighten all anchor bolts.
4.
Reconfirm that the crossmember is level
(Figure 13)
and that the column is level
front to rear and side to side
(Figure 14)
. Add or remove shims as required.
5.
Torque all anchor bolts to 150 ft-lbs. (203 Nm), continually checking that the
crossmember and column are level as you proceed. If anchor bolts do not tighten
to 150 ft-lbs. OR project more than 1 ¾” above the concrete surface
(Figure
16C)
, the concrete MUST be replaced by an appropriate concrete pad
.
(Consult
Product Manufacturer / Supplier for further details).
6.
Verify that the entire lift is level both horizontally and vertically, to ensure
optimum lifting performance.
*Perform a monthly inspection and torque all anchor bolts to 150 ft-lbs. (203 Nm).
Содержание EELR326A
Страница 8: ...7 5 2 BAY LAYOUT Figure 3 Bay Layout ...
Страница 10: ...9 Figure 4 Safety Shut Off Bar Installation Figure 5 Safety Shut Off Bar Power Side ...
Страница 24: ...23 8 PARTS MANUAL 8 1 LIFT ASSEMBLY ...
Страница 27: ...26 8 3 HYDRAULIC SYSTEM ...
Страница 29: ...28 8 5 POWER PACK 6 2055 AB 1381 208 230V 1PH 60Hz ...