11
5.7 POWER PACK INSTALLATION
1. Remove
the
red
plastic cap located at the rear of the power pack, and install the
90
°
fitting (page 25, item 18) located in the hardware kit.
2.
Bolt power pack to the mounting bracket on the power side tower using four (4)
5/16”-18UNC x 1”LG. hex head bolts, lock washers, flat washers and nuts.
Do not tighten.
3. A
certified electrician
must connect the 230Volt/Single phase power to the motor.
The electrical diagram is provided, refer to
Figure 8
.
Figure 7 – Powerpack Details
Содержание EELR326A
Страница 8: ...7 5 2 BAY LAYOUT Figure 3 Bay Layout ...
Страница 10: ...9 Figure 4 Safety Shut Off Bar Installation Figure 5 Safety Shut Off Bar Power Side ...
Страница 24: ...23 8 PARTS MANUAL 8 1 LIFT ASSEMBLY ...
Страница 27: ...26 8 3 HYDRAULIC SYSTEM ...
Страница 29: ...28 8 5 POWER PACK 6 2055 AB 1381 208 230V 1PH 60Hz ...