18
Figure 13 – Crossmember Leveling
Figure 14 – Tower Leveling
Figure 15 – Shim Placement
Figure 16 – Anchor Installation
3.
Refer to Bay Layout
(Figure 3)
to ensure that the column is still in the proper
position. Using a rotary hammer drill with a ¾” masonry drill bit, drill holes in
the floor on the high side column using the tower baseplate as a template. Make
sure that the ¾” masonry drill is in good condition
(Figure 16A)
.
4.
Carefully clean out drilling dust from the anchor holes. Hammer in the anchor
bolts
(Figure 16B)
. Hand tighten all anchor bolts.
Содержание EELR326A
Страница 8: ...7 5 2 BAY LAYOUT Figure 3 Bay Layout ...
Страница 10: ...9 Figure 4 Safety Shut Off Bar Installation Figure 5 Safety Shut Off Bar Power Side ...
Страница 24: ...23 8 PARTS MANUAL 8 1 LIFT ASSEMBLY ...
Страница 27: ...26 8 3 HYDRAULIC SYSTEM ...
Страница 29: ...28 8 5 POWER PACK 6 2055 AB 1381 208 230V 1PH 60Hz ...