10
blank. Reinsert the battery, making sure to match the
+
and
–
markings.
The power up sequence will start, the pump will go through
an electronic self-test, and the pump will beep at the end
of the power up sequence. All of the display indicators, the
software revision level, and each parameter will appear
briefly.
CAUTION: Do not store the pump for prolonged periods of
time with the battery installed. Battery leakage could dam-
age the pump.