HAT828 High Speed ATS Controller User Manual Page 28 of 56
No.
Item
Range
Default
Description
Bit3: Apr.
Bit4: May
Bit5: June
Bit6: July
Bit7: Aug.
Bit8: Sep.
Bit9: Oct.
Bit10: Nov.
Bit11: Dec.
13
Time (Date)
(1~31)
1
The date of genset not start.
14
Time (Week)
(1~127)
1
Bit0: Sunday
Bit1: Monday
Bit2: Tuesday
Bit3: Wednesday
Bit4: Thursday
Bit5: Friday
Bit6: Saturday
15
Time (Hour)
(0~23)
0
The time of genset not start.
16
Time (Minute)
(0~59)
0
17
Duration
(0~30000)
30
The duration time of genset
NOT
running.
Load Setting
1
Elevator Enable
(0~1)
0
0: Disable 1: Enable
2
Elevator Delay
(0~-300)s
300
It’s the delay time before the load
disconnect or switch transfer. Used for
control the running elevator stop at the
nearest floor until the switch transfer is
terminated.
Digit Inputs Setting
1
Digital Input 1
(0~35)
0
Not Used.
2
Active Type
(0~1)
0
0: Close to activate;
1: Open to activate.
3
Digital Input 2
(0~35)
0
Not Used.
4
Active Type
(0~1)
0
0: Close to activate;
1: Open to activate.
5
Digital Input 3
(0~35)
0
Not Used.