![SMA Sunny Island 4248U Скачать руководство пользователя страница 46](http://html1.mh-extra.com/html/sma/sunny-island-4248u/sunny-island-4248u_installation-and-operating-instructions-manual_1294205046.webp)
Commissioning
SI4248U Manual
38
Commissioning
Preparation
NOTE: Before beginning, recheck all of the power connections for correct polarity
and assure that they are torqued to specification.
Once the wiring is complete, the system parameters need to be set. You will be setting
parameters for battery type, battery capacity, and generator configuration.
For your convenience, we’ve provided space here for you to enter that information before
beginning.
Battery Type: _____________ Valve Regulated Lead Acid (VRLA) or Flooded Lead Acid (FLA)
**Battery Capacity: ________ Amp Hours (100 to 6000)
**The Sunny Island 4248U assumes a C20 (twenty hour capacity) value for capacity
NOTE: Some batteries list the amp-hour capacity in the 10 hr. rate on the label.
To calculate the 20 hr. rate the 10 hr. rate has to be multiplied by 1.1.
**The Sunny Island 4248U defaults to a 100 amp-hour battery capacity
Generator: _ None _Manual _Two-Wire _GenMan Option Installed
Maximum Generator Output Current: ___Amps (0.0 to 60.0)
Содержание Sunny Island 4248U
Страница 2: ...SI4248U Installation Guide ii...
Страница 6: ...SI4248U Installation Guide vi...
Страница 74: ...Battery Management SI4248U Manual 66...
Страница 98: ...Battery Management SI4248U Manual 90...
Страница 99: ......
Страница 100: ......