(First) Commissioning
SMA Solar Technology AG
86
SBU2200-TEN083320
Technical Description
10 (First) Commissioning
10.1 Requirements
The Quick Configuration Guide (QCG) allows you to quickly and easily commission your Sunny
Backup System S.
• Select the system you need in the menu for the Sunny Backup 2200.
– Start System
– New System
– New Battery
• Read and "answer" the special queries using the Sunny Remote Control 1.
• Set the parameters for the particular system you want to use.
Check connections
Before starting the commissioning process, make sure all electrical connections have the
correct polarity and are connected according to the instructions in sections 7 „Electrical
Connection of the Sunny Backup 2200“ (46) and 8 „Electrical Connection of the
Automatic Switch Box S“ (69).
Always save data
Always use the MMC/SD card to save data and events. This is necessary in order for SMA
Solar Technology AG to be able to help you in the event of a fault.
QCG requires the Sunny Remote Control 1
You need the Sunny Remote Control 1 in order to read the menus and error lists or set the
parameters!
The Sunny Backup 2200 can also be started without the Sunny Remote Control 1, but then
the device will only run with the factory default parameters (see section 9 „Control
Elements“ (82)).