![sitrex Action 120 Скачать руководство пользователя страница 38](http://html.mh-extra.com/html/sitrex/action-120/action-120_use-and-maintenance-manual_1285841038.webp)
Round Baler ACTION 120
USE AND MAINTENANCE MANUAL - 38 -
Fig. 28
– Hydraulic jacks placement
WARNING
The jacks must be fitted with suitable supports
or one side in contact with the round baler
made of a non-slip rubber in order to avoid
dangerous heeling of the lifted part.
WARNING
Use the lifting by jacks only for interventions
on the machine made by trained personnel. Do
not leave the machine on jacks for parking or
for a period longer than 2 hours.
6.12 STORAGE
At the end of the season, or in the event the
machine is to be left idle for a lengthy period, the
following steps are necessary:
- Make sure all the product inside the round baler
has been unloaded.
- Place the round baler on a suitable level
surface.
- Wedge suitable chocks under the wheels and
make sure all the guards on the machine are in
place.
- Wash the machine to delete any traces of dirty.
- Perform a careful checking and if is necessary,
replace damaged or worn parts.
- Check all nuts and bolts are properly tightened.
- Perform the complete greasing operation,
lubricating all the points, chains included.
- Any worn areas should be treated with a coat of
rust inhibitor.
- Parking the machine in a dry and sheltered
place.
If these operations are carried out with care,
the advantage will be only the user as to the
resumption of the work will find an equipment
in optimal conditions.
In case of dismantling the machine, follow the
anti-pollution laws and, in particular, the
disposing of exhaust lubricants and the
various
elements,
according
to
their
differentiated structure
.
WARNING
In the case in which a long period of inactivity
of the round baler is foreseen, it is necessary
to lubricate all the parts subject to usury and
to put the machine in a sheltered and dry
environment covering it with a plastic sheet.
In this way, when the work is resumed, a
machine
will
be
in
optimal
operating
conditions.
Содержание Action 120
Страница 1: ...Before starting to use the machine read the instructions Use and maintenance manual Round baler ...
Страница 9: ...Round Baler ACTION 120 USE AND MAINTENANCE MANUAL 9 C 188 cm D 360 cm E 35 100 cm F 201 cm ...
Страница 17: ...Round Baler ACTION 120 USE AND MAINTENANCE MANUAL 17 Pic 4 Safety signs position on the machine ...
Страница 22: ...Round Baler ACTION 120 USE AND MAINTENANCE MANUAL 22 Don t use bale ejector with hilly grounds ...
Страница 41: ...Round Baler ACTION 120 USE AND MAINTENANCE MANUAL 41 ...
Страница 43: ...USE AND MAINTENANCE MANUAL 43 ...