63 22 668 D3561
52
D3561
.
021.01.06
.
02 12.2014
6 Checklist
Sirona Dental Systems GmbH
6.1 Installation site
Installation Requirements SINIUS / SINIUS CS / SINIUS TS
6
Checklist
6.1
Installation site
We recommend performing an inspection of the circumstances on location at least 4 weeks prior to installation. The
checklist should help you when doing this.
This can help ensure a smooth procedure on the day that the SINIUS is actually installed.
Installation location:
● Installation location:
● Unit location:
● Building number:
● Room name/number:
Содержание Sinius
Страница 1: ...f o NOKOMNQ pfkfrp L pfkfrp p L pfkfrp qp k W b Installation requirements...
Страница 2: ......
Страница 57: ......